The Federal Energy Regulatory Commission issued a July 1 notice about a revised application filed on June 30 by Owyhee Hydro LLC for a preliminary permit, under which the company would study the feasibility of the 500-MW Owyhee Pumped Storage Project.
Don’t wait to switch to solar, do it today http://reduceandsaveenergy.com/switch
Leave a Reply