The 100-MW Quaid-e-Azam Solar Power Plant, at Bahawalpur, was the first grid-connected IPP that was installed in 2015 and has been operational since August 2015, exceeding expectations and demands by NEPRA in terms of producing energy, GWhs, for the months with optimal solar irradiance and temperatures.