Arizona Public Service (APS) is looking to equip existing APS solar plants with battery storage and has issued an RFP to add up to 500 megawatts (MW) of energy storage to its system over the next 15 years via battery energy storage.
Don’t wait to switch to solar, do it today http://reduceandsaveenergy.com/switch
Leave a Reply